Signaplex Academy
2. One Composite. Five Timeframes.
Learn the five chart timeframes and the distinct job each one performs in the takeoff sequence.
MODULE 2 / 7
One Composite. Five Timeframes.
PSI Composite is read first. POWER, SPEED, LIFT, PITCH, and SLOPE explain the timeframe structure behind it.
100755025
−25−50−75−100
The flight controls
POWER — 15-minute chartThe fastest timeframe. It usually reacts first.
SPEED — 30-minute chartShows whether the initial move is gaining momentum.
LIFT — 1-hour chartShows whether the move is developing beyond short-term noise.
PITCH — Daily chartShows whether the daily structure is rotating upward or downward.
SLOPE — 3-day chartThe broadest timeframe and the final stage of the takeoff sequence.
Important
PSI Composite is not a simple arithmetic average. A near-neutral PSI Composite can coexist with negative components, as shown above.